Project structure

Back  Home  Next

This structure view is used to create a project hierarchy. All elements can be structured freely. Exception: It is exclusively more elements of the type “Inventory number” than can be assigned to an inventory number. The following structural elements are available:

 

Ordner

Folder

Betreiber

Operator

Werk

Plant

Projekt

Project

Auftrag

Order

Gewerk

Sub section

Inventarnummer

Inventory number (==)

Subsystem

Subsystem

 

 

Usually the project approvals are generated by the Material Approval Lists (MFL´s); if not those approval are designated as Special Approvals.

 

 

MFL_Structure

MFL_Structure

 

 

The devices approved in this structure element / project are displayed in the following table:

 

 

Project_Approvals

Project_Approvals

 

 

Here you can find all information you need concerning arranging, editing and analyzing all tables displayed in every MDM view: Tables.