Selection of the MFL or the project belonging to the EPLAN Electric P8-Project |
In order to check the material approvals a MDM structure element (MFL or project) is allocated to the EPLAN project, entered in the project attributes and displayed on the cover sheet. Please, proceed as follows to assign an MFL / project:
•Start the menue “Utility programmes – MDM – MFL / assign project”. •Select the desired MFL / Project in the material data manager
• click on the button “MFL / select project…” to transfer the marked MFL / project to the Eplan project. The selected material approval list will be assigned to the project and entered in the project attributes.
|